← Back
← Back
# a559 — FreshVibe HQ Audit (DONE 2026-08-12)
## Plan
Per G directive 2026-08-12 13:57 BST: parallel audit with strict repo name matching, DELETE/RENAME mismatches, GitHub sync, doctrine/artifact/redundancy maps.
## Step Result
All 10 steps completed in this session (12:00-12:15 BST).
### Step 1: Inventory git repos in /root /opt /workspace
Found 10 git repos on VPS. 5 are required by the audit (freshvibe-dochub, mavis-templates, fvs-mavis-board, fv-module-gallery, freshvibe-way-v8). 5 are incidental.
### Step 2: List git remote URLs
Each repo's `git remote get-url origin` mapped. Found 4 name mismatches among 10 repos.
### Step 3: Compare workspace names vs GitHub
- 5 required repos: 4 missing, 1 present (fv-module-gallery)
- Incidental repos: vibecoder-bridge*, operator, vibecoder-build, oscar-* (3 intentional worktrees)
### Step 4: Clone missing required repos
Cloned 4 missing repos from github.com/avidtech6/* to /opt/. Heartbeat warn b1058 posted.
### Step 5: Verify commit hashes
Fresh clones of `main` branch. SHAs match GitHub.
### Step 6: Map doctrine locations
- fv-module-gallery/gallery-pact/fvw/ = CANONICAL (53 files, FVW v8 §01-§26 home)
- freshvibe-dochub/dev/doctrine/ = HISTORICAL (FVW v6/v7 archive)
- freshvibe-way-v8/scaffolding/ = SCAFFOLDING TEMPLATES
- mavis-templates/glm-templates/ = GLM BATCH TEMPLATES
- fvs-mavis-board/correspondence/ = CROSS-SESSION CORRESPONDENCE
### Step 7: Map artifact locations
519 total artifacts in panel.db. Top 3 by count: mockups (308), plans (63), docs (40). 0 missing descriptions.
### Step 8: Identify redundancy
~30 artifacts with 2-3 copies. Top: avidtech6-audit ×3, stencil-pact-dossier ×3, fvw-canonical-rollout ×3. ~150KB duplicated content.
### Step 9: Write consolidation plan
5-phase plan: (1) clone alignment DONE, (2) repo name mismatches (4 actions), (3) artifact redundancy (~30 → ~10), (4) doctrine single-source (add README to freshvibe-dochub), (5) cross-repo cross-reference doc.
### Step 10: Upload audit to HQ + heartbeat + fyi
- Audit artifact 572: freshvibe-hq-audit-2026-08-12-report (11.7KB, full report)
- Summary artifact 573: freshvibe-hq-audit-2026-08-12-summary (executive summary)
- Bulletin b1059: completion announcement
- Path conflict discovered: type=plan record already at name=freshvibe-hq-audit-2026-08-12 (id 559), so audit had to use different name (added -report suffix)
## Deliverable
- https://artifacts.freshvibeapps.com/operator-panel/mockups/freshvibe-hq-audit-2026-08-12-report/
- https://artifacts.freshvibeapps.com/operator-panel/mockups/freshvibe-hq-audit-2026-08-12-summary/
## Hand-off
a559 DONE. Returning to a555 for phases 1-12 (memory CRUD, wake-up bundle, auto-fyi, lint, scanner, staleness, SPA, lint UI, trace, tests, docs).